ARCHIBUS Smart Client
ARCHIBUS Web Central
Asset Management / Asset Portal / Equipment
Capital Project Management / Commissioning / Post-Construction

Equipment Reports

The Equipment process includes a variety of reports to help you review, analyze, and print your equipment data. Some of the reports include a floor plan drawing developed in CAD; others require only an alphanumeric inventory of your equipment.

Most reports are available from both Web Central or the Smart Client. If a report is available from only Web Central or the Smart Client, that information is noted in the below descriptions.

For Commissioning, these reports enable Operations Managers to review and analyze mechanical life cycle tracking for existing buildings, as well as for newly commissioned building systems.

The following key asset life cycle metrics are available for each asset:

Using these metrics, you can see patterns developing by identifying buildings that have the most equipment with an Equipment Age that has exceeded the anticipated Years Life Expectancy for that equipment standard.

The Equipment process includes the following reports:

Equipment Standards Book: This report includes a selection list of all your equipment standards. When you click a standard in the selection list, the report presents the information stored for the selected Equipment Standards, including a graphic of the standard if one has been added. You can print a standard using the Print button.

For Commissioning, this report allows Operations Managers to define mechanical life cycle tracking for existing equipment standards. You can associate the Years Life Expectancy, as well as the Classification Code with the standard, and thus with the equipment assets associated with the standard.

View Equipment Plan: View a floor plan drawing that shows equipment asset symbols for the areas on the floor. When you click on an equipment asset in the drawing, a pop-up window shows details for the asset, including the image for the equipment standard for that piece of equipment if such an image exists. Below the drawing is a list with details for the equipment assigned to that floor. You can set a restriction to show only floors for a particular site or building, and can generate a paginated report that uses the restriction you set. For Commissioning, this report allows Operations Managers to review and analyze mechanical life cycle tracking for existing buildings, as well as newly commissioned building systems.

For the following reports, you can export the data to Excel (by clicking the XLS button) to manipulate or print the data.

You can set a restriction for the following reports, and can generate them as paginated reports that use the restriction you set:

Asset Management only reports: The following reports are available for Asset Management, but are not used in the Commissioning processes.